Typically, you need at least nine sets of building plans, as follows1:
- 1 or 2 sets for yourself
- 2 sets for the general contractor
- 2 sets for the plumbing contractor
- 1 set for the electrical contractor
- 1 set for the heating contractor
- 2-4 sets for collecting bids (you should ask for these to be returned with the bids)
- 1 set for the local building department
- 1 set for the lender.
|